Road Closure | St. Pierre Rd | Paving
More
Please note that paving work is being completed in two parts on St. Pierre Road.
Road Closure | Part 1
- When: September 9, 2024 at 7 a.m. to September 11, 2024 at 6 p.m.
- Where: St. Pierre (from Route 300 to Route 200)
- Why: First section of paving for St-Pierre Rd from Route 300 to Route 200. Open to local traffic only, vehicles cannot go through, please follow detour signs and drive carefully.
- Detour in place: Route 300 at St. Pierre Road, to St. Guillaume Road, to Route 200, to St. Pierre Road.
Road Closure | Part 2
- When: September 12, 2024 at 7 a.m. to September 16, 2024 at 6 p.m.
- Where: St. Pierre (from Route 200 to 60m northeast of St. Guillaume Rd)
- Why: Second section of St. Pierre Road paving, from Route 300 to St. Guillaume Rd. Open for emergency vehicles and local traffic only, please follow detour signs and drive carefully.
- Detour in place: Route 200 at St. Pierre Rd, to St. Guillaume Rd, to 30m south of St. Pierre Rd.
Please see the map from www.Municipal511.ca for detour information.